Project
Ashton Coal Mine – Tailings
Mining
Principal Client
Yancoal
Head Contractor
Global Soils
Location
Camberwell, NSW
Duration
2 Days
scope of works
Global Soils delivered an aerial dust suppression program and worked with Yancoal to develop the project methodology. A great outcome that included the following services:
- Consultation and advice
- 21 loads mixed using 2 hydroseeding trucks
- 21,000L on Vital Bon Matt HR (21 IBCs) used
- Approx 325 helicopter applications at 650L per load
- Approx. 210,000L of water used
- 21ha of area covered
- • Dust Control
See More Projects
Contact Us
Contact Global Soils now via our contact form or directly via the below details: