Project
Liddell Ash Dam
Mining
Principal Client
AGL
Head Contractor
Global Soils
Location
Hunter Valley
Duration
2 Weeks
scope of works
As part of the Liddell Closure Program, ash in the form of slurry ceased being pumped into the Liddell Ash Dam (LAD) in order to commence capping and land rehabilitation.
To prevent dust emission and erosion of the capped site, GSS delivered a combination of Vital Bon-Matt Stonewall and Vital Bon-Matt HR across an area of 1,200,000m2.
A tracked-tractor equipped with spray boom was deployed over a two-week period. The result – a preventative layer with minimal untreated areas.
- • Dust Control • Erosion Control