Global Soils was engaged to stabilise a steep, highly eroded embankment – an area that encompassed approximately six hectares, with sections exceeding 45% gradient, presenting significant erosion and access challenges.
To address these conditions, Global Soils implemented an integrated stabilisation solution incorporating aerial application of Vital Bon-Matt HR to bind and stabilise exposed, erodible surfaces. A tailored native grass seed mix plus fertiliser was also included to promote vegetation establishment and provide long-term erosion control and surface stability.
- • Soil Stabilisation